Skip to analysis
This is a explanation of this problem from USACO's training website. I have converted it to markdown. Please do not just copy code; you will not learn anything; at least type it out and understand so you can do it yourself in the future!
Farmer John has N hills on his farm (1 <= N <= 1,000), each with an integer elevation in the range 0 .. 100. In the winter, since there is abundant snow on these hills, FJ routinely operates a ski training camp.
Unfortunately, FJ has just found out about a new tax that will be assessed next year on farms used as ski training camps. Upon careful reading of the law, however, he discovers that the official definition of a ski camp requires the difference between the highest and lowest hill on his property to be strictly larger than 17. Therefore, if he shortens his tallest hills and adds mass to increase the height of his shorter hills, FJ can avoid paying the tax as long as the new difference between the highest and lowest hill is at most 17.
If it costs x^2 units of money to change the height of a hill by x units, what is the minimum amount of money FJ will need to pay? FJ can change the height of a hill only once, so the total cost for each hill is the square of the difference between its original and final height. FJ is only willing to change the height of each hill by an integer amount.
PROGRAM NAME: skidesign
INPUT FORMAT:
Line 1: | The integer N. |
Lines 2..1+N: | Each line contains the elevation of a single hill. |
SAMPLE INPUT (file skidesign.in):
5
20
4
1
24
21
INPUT DETAILS:
FJ’s farm has 5 hills, with elevations 1, 4, 20, 21, and 24.
OUTPUT FORMAT:
The minimum amount FJ needs to pay to modify the elevations of his hills so the difference between largest and smallest is at most 17 units.
SAMPLE OUTPUT (file skidesign.out):
18
OUTPUT DETAILS:
FJ keeps the hills of heights 4, 20, and 21 as they are. He adds mass to the hill of height 1, bringing it to height 4 (cost = 3^2 = 9). He shortens the hill of height 24 to height 21, also at a cost of 3^2 = 9.
CODE
Java
C++
Pascal
ANALYSIS
Fatih Gelgi
The problem can be solved with different approaches. A simple idea is of course brute-force – try all possible elevations and find the minimum amount. We can try all possible values as follows: try the modification for elevation interval (0,17) then (1,18), (2,19), …, (83,100). For each elevation interval (i,i+17), we need to calculate the cost for each hill j:
- If the elevation of hill j, say hill[j], is in the interval (i,i+17) then there is no cost.
- If it is less than i then the cost increases by (i-hill[j])^2
- If it is greater than i+17 then the cost increases by (hill[j]-(i+17))^2
The total cost for that interval will be the sum of the costs of modifying all hills.
For the sample input:
hill elevation intervals and cost
height (0,17) (1,18) (2,19) (3,20) (4,21) (5,22) (6,23) (7,24) ....
------ ---------------------------------------------------------------
1 0 0 1 4 9 16 25 36
4 0 0 0 0 0 1 4 9
20 9 4 1 0 0 0 0 0
21 16 9 4 1 0 0 0 0
24 49 36 25 16 9 4 1 0
-------------------------------------------------------------
total 74 49 31 21 *18* 21 30 45
As you observed, it is unnecessary to try elevation intervals after (7,24) since the maximum height is 24. You may want to modify the solution to eliminate these type of redundancies although it is not necessary.
For each interval, scanning through all hill elevations require O(N) time. Since we try all possible intervals, the total time is O(NM) where M is the size of the elevation range. Since N=1000 and M=100 are very small, this brute-force approach is sufficient. A sample code is provided below:
#include <fstream>
using namespace std;
int n,hills[1000];
int main()
{
ifstream fin("skidesign.in");
fin >> n;
for (int i=0; i<n; i++)
fin >> hills[i];
fin.close();
// brute-force search
// try all elevation intervals from (0,17) to (83,100)
int mincost=1000000000;
for (int i=0; i<=83; i++)
{
// calculate the cost for elevation interval (i,i+17)
int cost=0,x;
for (int j=0; j<n; j++)
{
// if hill is below the interval
if (hills[j]<i)
x=i-hills[j];
// if hill is above the interval
else if (hills[j]>i+17)
x=hills[j]-(i+17);
// if hill is int the interval
else
x=0;
cost+=x*x;
}
// update the minimum cost
mincost=min(mincost,cost);
}
ofstream fout("skidesign.out");
fout << mincost << "\n";
fout.close();
}
Back to top